Construction of balance Works of Six Laning of Jaipur Ring Road (New NH) (Km 0+300 to Km 46+700) between Agra Road and Ajmer Road Section in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode
810.00 cr
Pre Bid & Topography survey with Plan and profile design
Gawar Construction Limited
NHAI
2
Hisar to Dabwali section-I from design chainage km 170.000 to km 227.000 of NH-10 in the State of Haryana
549.00 Cr
Pre Bid
Gawar Construction Limited
NHAI
3
Hisar to Dabwali Section of NH-10 From km. 227.000 to km 314.660 with paved shoulder in the State of Haryana.
648.00Cr
Pre Bid
Gawar Construction Limited
NHAI
4
DEVELOPMENT OF TWO LANING WITH PAVED SHOULDER OF FIROZPUR JHIRKA BIWAN ROAD (~14.28 KM ) IN THE STATE OF HARYANA TO BE EXECUTED ON DBFOT (TOLL) BASIS
64.00 Cr
Pre Bid
Gawar Construction Limited
HARYANA PWD B&R BR. CHANDIGARH
5
Two-Lane with Paved Shoulder Project Highway comprises the section of National Highway 21 (now new NH-3) commencing from km 272+000 to km 310+400 i.e. the Kullu – Manali section (including Manali bypass excluding Manali Beas bridge) in the State of Himachal Pradesh
218.47 Cr
Pre Bid & Topography survey with Plan and profile design
Gawar Construction Limited
NHAI
6
Rehabilitation and Up-gradation to 2-Lane Paved Shoulder from Makhu (Design Ch. 0+000) to Arifke ( Design Ch. 24+600) on EPC Mode in the State of Punjab, EPC Mode.
127.26Crore
Pre Bid & Detailed design
Ceigall India Ltd.
Chief Engineer (NH) Punjab
7
Development And Maintenance of Ajeetgarh-Chala section of SH-13, Sikar-Ganeri-Jaswantgarh section of SH-20&20A, Bidasar -Nokha section of SH-20 and Singhana-Buhana-Haryana Border section of SH-13B, Total Length: 233.955 Km in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode.
348.29 Cr
Pre Bid & Topography survey with Plan and profile design
Gawar Construction Limited
NHAI
8
Development of the Project Highway, along NH24, with 6 laning of Expressway and 4-Laning of NH, on both sides from km. 0.000 (NH24 junction with Ring Road) to Km 8.716 (Design Chainage) Gaziabad
663.60 Cr
Pre Bid
Gawar Construction Limited
NHAI
9
Construction of ROB and its approaches in lieu of Level Crossing No. C-25 at km 132.850 on NH-334B at Jhajjar in the State of Haryana on EPC Mode.
23.74 Cr
Pre Bid & Topography survey with Plan and profile design
Gawar Construction Limited
PWD (B&R) Br. Haryana
10
Four Laning of Solan- Kaithlighat Section of NH-22 (Now NH-5) from Km. 106.000 to Km. 129.050, on EPC Mode in the State of Himachal Pradesh, under NHDP Phase – III
478.74 Cr
Gawar Construction Limited
NHAI
11
Four Laning of Gagalheri-Saharanpur-Yamunanagar (UP/Haryana Border) section of NH-73 from km.33.000 (design chainage km.35.400) to km. 71.640 (design chainage km.86.855) in the state of Utter Pradesh under NHDP-IV on Hybrid Annuity Mode.
932.20 Cr
Pre Bid & Topography survey with Plan and profile design
Gawar Construction Limited
NHAI
12
Development of Four Lanes with Paved Side Shoulders of End of Patiala Bypass to Start of Sangrur Bypass Section on NH-64 (New NH No-7) from Existing KM. 64/570 to 106/170 in the State of Punjab on EPC mode under NHDP-IV
297.00 Cr
Pre Bid
Gawar Construction Limited
NHAI
13
Description of“Rehabilitation and Upgrading to 2- Lane to 4/6 Lane with Paved Shoulders of YamunanagrPanchkula Section (km 160+357 to km 179+249) of NH-73 in the State of Haryana under NHDP Phase III”
207.00 Cr
Topography survey with Plan and profile design
Gawar Construction Limited
NHAI
14
Construction/ Upgradation of Four/ Two lane with Paved Shoulder of NH 68 from Tanot-RamgarhBhadasar-Jaisalmer (Design Ch. 0.000 to 125.573) and NH from Bhadasar (Mokal)Sarkaritala up to Pakistan Border (Design Ch. 0.000 to 67.950) under Phase-I of BharatmalaPariyojana (total length 193.523km) on EPC Mode in the State of Rajasthan.
590.00 Cr
Pre-Bid and Detail design
BrijGopal Construction Co. Pvt Ltd.(BGCC)
NHAI
15
Rehabilitation and augmentation of New NH-354 (old SH-21) of section Khemkaran town to Start of Amritsar bypass from Design Chainage km 22.673 (existing km 65.477 of SH) to Design Chainage km 71.496 (existing km 16.351 of SH) for Length of 48.823 km into Two Lane with the paved shoulder / Four-Laning under Bharatmala scheme in the state of Punjab on EPC Mode (Pkg-II)
149.90 Cr
Detail Design work
Ceigall India Ltd.- Inderjit Mehta Constructions Pvt.Ltd.(JV)
NHAI
16
Four Laning of Existing Two Lane with Paved Shoulder Road from TalwandiBhai to Ferozepur NH-05 (Old NH-95) from km 170.380 to km 194.040 in the state of Punjab
207.00 Cr
Detail Design work
Ceigall India Ltd.-Shiv BuildindiaPvt.Ltd.(JV)
NHAI
17
Rehabilitation and Up-gradation to 2-Lane Paved Shoulder of Mudki-Jawahar Singh Wala, Section of NH-254 from Design Km 19.500 to 38.000, in the State of Punjab, EPC Mode (Package No.1)
88.20 Cr
Pre Bid & Detailed design
Ceigall India Ltd.
Chief Engineer (NH) Punjab
18
Rehabilitation and Upgradation of Moga (LoharaChowk on NH-05) at Design Ch. 0+000 (Existing Km 0+000) to Makhu (at Junction with Nh 703A) at design Ch. 33+611 (Existing Km 33+622) (Design Length= 33.611Km including construction of ROB at LC 81-S/2-E at design ch. 32+240) via KotIse Khan and Harike (On NH-54 near Harike Town ) at Design Ch 44+680 (Existing Km 44+680) to Khalra (Up to International Border) at Design Ch 86+236 (Existing Km 86+203) (Design Length = 41.556Km including Construction of ROB at LC No.B53/E2 at Design Ch. 59+007) via Bhikhiwind to two lane with paved shoulders of NH-703B (Project Length =m 75.167Km.) in the State of Punjab.(EPC Mode)
245.07 Cr
Pre Bid & Detailed design
Ceigall – IMC (JV)
Chief Engineer (NH) Punjab
19
Rehabilitation and Up-gradation to 2-Lane Paved Shoulder from Makhu (Design Ch. 0+000) to Arifke ( Design Ch. 24+600) on EPC Mode in the State of Punjab, EPC Mode.
127.26 Cr
Pre Bid & Detailed design
Ceigall India Ltd.
Chief Engineer (NH) Punjab
20
Rehabilitation And Up-Gradation Of Nh.247 Section From Nilajphata-Paoni-Adayal-Bhandara From Existing Km 0+000 (NilajPhata To Km 53+400(Bhandara) [Design Km 0+000 To Km 53+260] To Two Lane With Paved Shoulders In The State Of Maharashtra On Epc Basis.
1,053.3 cr
Detailed Design
Atcon
NHAI
On-Going Project
List of Projects
S.No
Name of Projects
Project Cost
Type of work
Client
Department
1
Construction/ Upgradation of Four/ Two lane with Paved Shoulder of NH 68 from Tanot-RamgarhBhadasar-Jaisalmer (Design Ch. 0.000 to 125.573) and NH from Bhadasar (Mokal)Sarkaritala up to Pakistan Border (Design Ch. 0.000 to 67.950) under Phase-I of BharatmalaPariyojana (total length 193.523km) on EPC Mode in the State of Rajasthan.
590.00Crore
Pre-Bid and Detail design
BrijGopal Construction Co. Pvt Ltd.(BGCC)
NHAI
2
Rehabilitation and augmentation of New NH-354 (old SH-21) of section Khemkaran town to Start of Amritsar bypass from Design Chainage km 22.673 (existing km 65.477 of SH) to Design Chainage km 71.496 (existing km 16.351 of SH) for Length of 48.823 km into Two Lane with the paved shoulder / Four-Laning under Bharatmala scheme in the state of Punjab on EPC Mode (Pkg-II)
149.90Crore
Detail Design work
Ceigall India Ltd.- Inderjit Mehta Constructions Pvt.Ltd.(JV)
NHAI
3
Four Laning of Existing Two Lane with Paved Shoulder Road from TalwandiBhai to Ferozepur NH-05 (Old NH-95) from km 170.380 to km 194.040 in the state of Punjab
207.00Crore
Detail Design work
Ceigall India Ltd.-Shiv BuildindiaPvt.Ltd.(JV)
NHAI
4
Rehabilitation and Up-gradation to 2-Lane Paved Shoulder of Mudki-Jawahar Singh Wala, Section of NH-254 from Design Km 19.500 to 38.000, in the State of Punjab, EPC Mode (Package No.1)
88.20Crore
Pre Bid & Detailed design
Ceigall India Ltd.
Chief Engineer (NH) Punjab
5
Rehabilitation and Upgradation of Moga (LoharaChowk on NH-05) at Design Ch. 0+000 (Existing Km 0+000) to Makhu (at Junction with Nh 703A) at design Ch. 33+611 (Existing Km 33+622) (Design Length= 33.611Km including construction of ROB at LC 81-S/2-E at design ch. 32+240) via KotIse Khan and Harike (On NH-54 near Harike Town ) at Design Ch 44+680 (Existing Km 44+680) to Khalra (Up to International Border) at Design Ch 86+236 (Existing Km 86+203) (Design Length = 41.556Km including Construction of ROB at LC No.B53/E2 at Design Ch. 59+007) via Bhikhiwind to two lane with paved shoulders of NH-703B (Project Length =m 75.167Km.) in the State of Punjab.(EPC Mode)
245.07Crore
Pre Bid & Detailed design
Ceigall – IMC (JV)
Chief Engineer (NH) Punjab
6
Rehabilitation and Up-gradation to 2-Lane Paved Shoulder from Makhu (Design Ch. 0+000) to Arifke ( Design Ch. 24+600) on EPC Mode in the State of Punjab, EPC Mode.
127.26Crore
Pre Bid & Detailed design
Ceigall India Ltd.
Chief Engineer (NH) Punjab
7
Rehabilitation And Up-Gradation Of Nh.247 Section From Nilajphata-Paoni-Adayal-Bhandara From Existing Km 0+000 (NilajPhata To Km 53+400(Bhandara) [Design Km 0+000 To Km 53+260] To Two Lane With Paved Shoulders In The State Of Maharashtra On Epc Basis.
Rs 1,053.3 crore
Detailed Design
Atcon
NHAI
Setting the standard for exceptional service in our industry.
We define clear service standards, continuously train our team, and listen closely to customer feedback to refine our approach and enhance performance across all touchpoints.