Projects Completed
Our reputation is as solid as concrete.
List of Projects | |||||
S.No | Name of Projects | Project Cost | Type of work | Client | Department |
1 | Construction of balance Works of Six Laning of Jaipur Ring Road (New NH) (Km 0+300 to Km 46+700) between Agra Road and Ajmer Road Section in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode | 810.00 cr | Pre Bid & Topography survey with Plan and profile design | Gawar Construction Limited | NHAI |
2 | Hisar to Dabwali section-I from design chainage km 170.000 to km 227.000 of NH-10 in the State of Haryana | 549.00 Cr | Pre Bid | Gawar Construction Limited | NHAI |
3 | Hisar to Dabwali Section of NH-10 From km. 227.000 to km 314.660 with paved shoulder in the State of Haryana. | 648.00Cr | Pre Bid | Gawar Construction Limited | NHAI |
4 | DEVELOPMENT OF TWO LANING WITH PAVED SHOULDER OF FIROZPUR JHIRKA BIWAN ROAD (~14.28 KM ) IN THE STATE OF HARYANA TO BE EXECUTED ON DBFOT (TOLL) BASIS | 64.00 Cr | Pre Bid | Gawar Construction Limited | HARYANA PWD B&R BR. CHANDIGARH |
5 | Two-Lane with Paved Shoulder Project Highway comprises the section of National Highway 21 (now new NH-3) commencing from km 272+000 to km 310+400 i.e. the Kullu – Manali section (including Manali bypass excluding Manali Beas bridge) in the State of Himachal Pradesh | 218.47 Cr | Pre Bid & Topography survey with Plan and profile design | Gawar Construction Limited | NHAI |
6 | Widening to Two lanes with paved shoulders of existing NH-709(Extn) From km 123.520 (near Devsarmor ) to km146.500(Before Jui Village) in District Bhiwani in the state of Haryana on EPC mode. | 25.90 Cr | Pre Bid & Topography survey with Plan and profile design | Gawar Construction Limited | HARYANA PWD B&R BR. CHANDIGARH |
7 | Development And Maintenance of Ajeetgarh-Chala section of SH-13, Sikar-Ganeri-Jaswantgarh section of SH-20&20A, Bidasar -Nokha section of SH-20 and Singhana-Buhana-Haryana Border section of SH-13B, Total Length: 233.955 Km in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode. | 348.29 Cr | Pre Bid & Topography survey with Plan and profile design | Gawar Construction Limited | NHAI |
8 | Development of the Project Highway, along NH24, with 6 laning of Expressway and 4-Laning of NH, on both sides from km. 0.000 (NH24 junction with Ring Road) to Km 8.716 (Design Chainage) Gaziabad | 663.60 Cr | Pre Bid | Gawar Construction Limited | NHAI |
9 | Construction of ROB and its approaches in lieu of Level Crossing No. C-25 at km 132.850 on NH-334B at Jhajjar in the State of Haryana on EPC Mode. | 23.74 Cr | Pre Bid & Topography survey with Plan and profile design | Gawar Construction Limited | PWD (B&R) Br. Haryana |
10 | Four Laning of Solan- Kaithlighat Section of NH-22 (Now NH-5) from Km. 106.000 to Km. 129.050, on EPC Mode | 478.74 Cr |
| Gawar Construction Limited | NHAI |
11 | Four Laning of Gagalheri-Saharanpur-Yamunanagar (UP/Haryana Border) section of NH-73 from km.33.000 (design chainage km.35.400) to km. 71.640 (design chainage km.86.855) in the state of Utter Pradesh under NHDP-IV on Hybrid Annuity Mode. | 932.20 Cr | Pre Bid & Topography survey with Plan and profile design | Gawar Construction Limited | NHAI |
12 | Development of Four Lanes with Paved Side Shoulders of End of Patiala Bypass to Start of Sangrur Bypass Section on NH-64 (New NH No-7) from Existing KM. 64/570 to 106/170 in the State of Punjab on EPC mode under NHDP-IV | 297.00 Cr | Pre Bid | Gawar Construction Limited | NHAI |
13 | Description of“Rehabilitation and Upgrading to 2- Lane to 4/6 Lane with Paved Shoulders of YamunanagrPanchkula Section (km 160+357 to km 179+249) of NH-73 in the State of Haryana under NHDP Phase III” | 207.00 Cr | Topography survey with Plan and profile design | Gawar Construction Limited | NHAI |
14 | Construction/ Upgradation of Four/ Two lane with Paved Shoulder of NH 68 from Tanot-RamgarhBhadasar-Jaisalmer (Design Ch. 0.000 to 125.573) and NH from Bhadasar (Mokal)Sarkaritala up to Pakistan Border (Design Ch. 0.000 to 67.950) under Phase-I of BharatmalaPariyojana (total length 193.523km) on EPC Mode in the State of Rajasthan. | 590.00 Cr | Pre-Bid and Detail design | BrijGopal Construction Co. Pvt Ltd.(BGCC) | NHAI |
15 | Rehabilitation and augmentation of New NH-354 (old SH-21) of section Khemkaran town to Start of Amritsar bypass from Design Chainage km 22.673 (existing km 65.477 of SH) to Design Chainage km 71.496 (existing km 16.351 of SH) for Length of 48.823 km into Two Lane with the paved shoulder / Four-Laning under Bharatmala scheme in the state of Punjab on EPC Mode (Pkg-II) | 149.90 Cr | Detail Design work | Ceigall India Ltd.- Inderjit Mehta Constructions Pvt.Ltd.(JV) | NHAI |
16 | Four Laning of Existing Two Lane with Paved Shoulder Road from TalwandiBhai to Ferozepur NH-05 (Old NH-95) from km 170.380 to km 194.040 in the state of Punjab | 207.00 Cr | Detail Design work | Ceigall India Ltd.-Shiv BuildindiaPvt.Ltd.(JV) | NHAI |
17 | Rehabilitation and Up-gradation to 2-Lane Paved Shoulder of Mudki-Jawahar Singh Wala, Section of NH-254 from Design Km 19.500 to 38.000, in the State of Punjab, EPC Mode (Package No.1) | 88.20 Cr | Pre Bid & Detailed design | Ceigall India Ltd. | Chief Engineer (NH) Punjab |
18 | Rehabilitation and Upgradation of Moga (LoharaChowk on NH-05) at Design Ch. 0+000 (Existing Km 0+000) to Makhu (at Junction with Nh 703A) at design Ch. 33+611 (Existing Km 33+622) (Design Length= 33.611Km including construction of ROB at LC 81-S/2-E at design ch. 32+240) via KotIse Khan and Harike (On NH-54 near Harike Town ) at Design Ch 44+680 (Existing Km 44+680) to Khalra (Up to International Border) at Design Ch 86+236 (Existing Km 86+203) (Design Length = 41.556Km including Construction of ROB at LC No.B53/E2 at Design Ch. 59+007) via Bhikhiwind to two lane with paved shoulders of NH-703B (Project Length =m 75.167Km.) in the State of Punjab.(EPC Mode) | 245.07 Cr | Pre Bid & Detailed design | Ceigall – IMC (JV) | Chief Engineer (NH) Punjab |
19 | Rehabilitation and Up-gradation to 2-Lane Paved Shoulder from Makhu (Design Ch. 0+000) to Arifke ( Design Ch. 24+600) on EPC Mode in the State of Punjab, EPC Mode. | 127.26 Cr | Pre Bid & Detailed design | Ceigall India Ltd. | Chief Engineer (NH) Punjab |
20 | Rehabilitation And Up-Gradation Of Nh.247 Section From Nilajphata-Paoni-Adayal-Bhandara From Existing Km 0+000 (NilajPhata To Km 53+400(Bhandara) [Design Km 0+000 To Km 53+260] To Two Lane With Paved Shoulders In The State Of Maharashtra On Epc Basis. | 1,053.3 cr | Detailed Design | Atcon | NHAI |
Projects On going
List of Projects | |||||
S.No | Name of Projects | Project Cost | Type of work | Client | Department |
1 | Construction/ Upgradation of Four/ Two lane with Paved Shoulder of NH 68 from Tanot-RamgarhBhadasar-Jaisalmer (Design Ch. 0.000 to 125.573) and NH from Bhadasar (Mokal)Sarkaritala up to Pakistan Border (Design Ch. 0.000 to 67.950) under Phase-I of BharatmalaPariyojana (total length 193.523km) on EPC Mode in the State of Rajasthan. | 590.00Crore | Pre-Bid and Detail design | BrijGopal Construction Co. Pvt Ltd.(BGCC) | NHAI |
2 | Rehabilitation and augmentation of New NH-354 (old SH-21) of section Khemkaran town to Start of Amritsar bypass from Design Chainage km 22.673 (existing km 65.477 of SH) to Design Chainage km 71.496 (existing km 16.351 of SH) for Length of 48.823 km into Two Lane with the paved shoulder / Four-Laning under Bharatmala scheme in the state of Punjab on EPC Mode (Pkg-II) | 149.90Crore | Detail Design work | Ceigall India Ltd.- Inderjit Mehta Constructions Pvt.Ltd.(JV) | NHAI |
3 | Four Laning of Existing Two Lane with Paved Shoulder Road from TalwandiBhai to Ferozepur NH-05 (Old NH-95) from km 170.380 to km 194.040 in the state of Punjab | 207.00Crore | Detail Design work | Ceigall India Ltd.-Shiv BuildindiaPvt.Ltd.(JV) | NHAI |
4 | Rehabilitation and Up-gradation to 2-Lane Paved Shoulder of Mudki-Jawahar Singh Wala, Section of NH-254 from Design Km 19.500 to 38.000, in the State of Punjab, EPC Mode (Package No.1) | 88.20Crore | Pre Bid & Detailed design | Ceigall India Ltd. | Chief Engineer (NH) Punjab |
5 | Rehabilitation and Upgradation of Moga (LoharaChowk on NH-05) at Design Ch. 0+000 (Existing Km 0+000) to Makhu (at Junction with Nh 703A) at design Ch. 33+611 (Existing Km 33+622) (Design Length= 33.611Km including construction of ROB at LC 81-S/2-E at design ch. 32+240) via KotIse Khan and Harike (On NH-54 near Harike Town ) at Design Ch 44+680 (Existing Km 44+680) to Khalra (Up to International Border) at Design Ch 86+236 (Existing Km 86+203) (Design Length = 41.556Km including Construction of ROB at LC No.B53/E2 at Design Ch. 59+007) via Bhikhiwind to two lane with paved shoulders of NH-703B (Project Length =m 75.167Km.) in the State of Punjab.(EPC Mode) | 245.07Crore | Pre Bid & Detailed design | Ceigall – IMC (JV) | Chief Engineer (NH) Punjab |
6 | Rehabilitation and Up-gradation to 2-Lane Paved Shoulder from Makhu (Design Ch. 0+000) to Arifke ( Design Ch. 24+600) on EPC Mode in the State of Punjab, EPC Mode. | 127.26Crore | Pre Bid & Detailed design | Ceigall India Ltd. | Chief Engineer (NH) Punjab |
7 | Rehabilitation And Up-Gradation Of Nh.247 Section From Nilajphata-Paoni-Adayal-Bhandara From Existing Km 0+000 (NilajPhata To Km 53+400(Bhandara) [Design Km 0+000 To Km 53+260] To Two Lane With Paved Shoulders In The State Of Maharashtra On Epc Basis. | Rs 1,053.3 crore | Detailed Design | Atcon | NHAI |