Projects Completed

Our reputation is as solid as concrete.

List of Projects

S.No

Name of Projects

Project Cost

Type of work

Client

Department

1

Construction of balance Works of Six Laning of Jaipur Ring Road (New NH) (Km 0+300 to Km 46+700) between Agra Road and Ajmer Road Section in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode

810.00 cr

Pre Bid & Topography survey with Plan and profile design

Gawar Construction Limited

NHAI

2

Hisar to Dabwali section-I from design chainage km 170.000 to km 227.000 of NH-10 in the State of Haryana

549.00 Cr

Pre Bid

Gawar Construction Limited

NHAI

3

Hisar to Dabwali Section of NH-10 From km.  227.000 to km 314.660 with paved shoulder in the State of Haryana. 

648.00Cr

Pre Bid

Gawar Construction Limited

NHAI

4

DEVELOPMENT OF TWO LANING WITH PAVED SHOULDER OF FIROZPUR JHIRKA BIWAN ROAD (~14.28 KM ) IN THE STATE OF HARYANA TO BE EXECUTED ON DBFOT (TOLL) BASIS

64.00 Cr

Pre Bid

Gawar Construction Limited

HARYANA PWD B&R                                                                                BR. CHANDIGARH

5

Two-Lane with Paved Shoulder Project  Highway  comprises  the  section  of National Highway 21 (now new NH-3) commencing from km 272+000 to km 310+400 i.e. the Kullu – Manali section (including Manali bypass excluding Manali Beas bridge) in  the  State  of  Himachal Pradesh

218.47 Cr

Pre Bid & Topography survey with Plan and profile design

Gawar Construction Limited

NHAI

6

Widening to Two lanes with paved shoulders of existing NH-709(Extn) From km 123.520 (near Devsarmor ) to km146.500(Before Jui Village) in District Bhiwani in the state of Haryana on EPC mode.

25.90 Cr

Pre Bid & Topography survey with Plan and profile design

Gawar Construction Limited

HARYANA PWD B&R                                                                                BR. CHANDIGARH

7

Development And Maintenance of Ajeetgarh-Chala section of SH-13, Sikar-Ganeri-Jaswantgarh section of SH-20&20A, Bidasar -Nokha section of SH-20 and Singhana-Buhana-Haryana Border section of SH-13B, Total Length: 233.955 Km in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode.

348.29 Cr

Pre Bid & Topography survey with Plan and profile design

Gawar Construction Limited

NHAI

8

Development of the Project Highway, along NH24, with 6 laning of Expressway and 4-Laning of NH, on both sides from km. 0.000 (NH24 junction with Ring Road) to Km 8.716 (Design Chainage) Gaziabad

663.60 Cr

Pre Bid

Gawar Construction Limited

NHAI

9

Construction of ROB and its approaches in lieu of Level Crossing No. C-25 at km 132.850 on NH-334B at Jhajjar in the State of Haryana on EPC Mode.

23.74 Cr

Pre Bid & Topography survey with Plan and profile design

Gawar Construction Limited

PWD (B&R) Br.  Haryana

10

Four Laning of Solan- Kaithlighat Section of NH-22 (Now NH-5) from Km. 106.000 to Km. 129.050, on EPC Mode
 in the State of Himachal Pradesh, under NHDP Phase – III

478.74 Cr

 

Gawar Construction Limited

NHAI

11

Four Laning of Gagalheri-Saharanpur-Yamunanagar (UP/Haryana Border) section of NH-73 from km.33.000 (design chainage km.35.400) to km. 71.640 (design chainage km.86.855) in the state of Utter Pradesh under NHDP-IV on Hybrid Annuity Mode.

932.20 Cr

Pre Bid & Topography survey with Plan and profile design

Gawar Construction Limited

NHAI

12

Development of Four Lanes with Paved Side Shoulders of End of Patiala Bypass to Start of Sangrur Bypass Section on NH-64 (New NH No-7) from Existing KM. 64/570 to 106/170 in the State of Punjab on EPC mode under NHDP-IV

297.00 Cr

Pre Bid

Gawar Construction Limited

NHAI

13

Description of“Rehabilitation and Upgrading to 2- Lane to 4/6 Lane with Paved Shoulders of YamunanagrPanchkula Section (km 160+357 to km 179+249) of NH-73 in the State of Haryana under NHDP Phase III”

207.00 Cr

Topography survey with Plan and profile design

Gawar Construction Limited

NHAI

14

Construction/ Upgradation of Four/ Two lane with Paved Shoulder of NH 68 from Tanot-RamgarhBhadasar-Jaisalmer (Design Ch. 0.000 to 125.573) and NH from Bhadasar (Mokal)Sarkaritala up to Pakistan Border (Design Ch. 0.000 to 67.950) under Phase-I of BharatmalaPariyojana (total length 193.523km) on EPC Mode in the State of Rajasthan.

590.00 Cr

Pre-Bid and Detail design

BrijGopal Construction Co. Pvt Ltd.(BGCC)

NHAI

15

Rehabilitation and augmentation of New NH-354 (old SH-21) of section Khemkaran town to Start of Amritsar bypass from Design Chainage km 22.673 (existing km 65.477 of SH) to Design Chainage km 71.496 (existing km 16.351 of SH) for Length of 48.823 km into Two Lane with the paved shoulder / Four-Laning under Bharatmala scheme in the state of Punjab on EPC Mode (Pkg-II)

149.90 Cr

Detail Design work

Ceigall India Ltd.- Inderjit Mehta Constructions Pvt.Ltd.(JV)

NHAI

16

Four Laning of Existing Two Lane with Paved Shoulder Road from TalwandiBhai to Ferozepur NH-05 (Old NH-95) from km 170.380 to km 194.040 in the state of Punjab

207.00 Cr

Detail Design work

Ceigall India Ltd.-Shiv BuildindiaPvt.Ltd.(JV)

NHAI

17

Rehabilitation and Up-gradation to 2-Lane Paved Shoulder of Mudki-Jawahar Singh Wala, Section of NH-254 from Design Km 19.500 to 38.000, in the State of Punjab, EPC Mode (Package No.1)

88.20 Cr

Pre Bid & Detailed design

Ceigall India Ltd.

Chief Engineer (NH) Punjab

18

Rehabilitation and Upgradation of Moga (LoharaChowk on NH-05) at Design  Ch. 0+000 (Existing Km 0+000) to Makhu (at Junction with Nh 703A) at design Ch. 33+611 (Existing Km 33+622) (Design Length= 33.611Km including construction of ROB at LC 81-S/2-E at design ch. 32+240) via KotIse Khan and Harike (On NH-54 near Harike Town ) at Design Ch 44+680 (Existing Km 44+680) to Khalra (Up to International Border) at Design Ch 86+236 (Existing Km 86+203) (Design Length = 41.556Km including Construction of ROB at LC No.B53/E2 at Design Ch. 59+007) via Bhikhiwind to two lane with paved shoulders of NH-703B (Project Length =m 75.167Km.) in the State of Punjab.(EPC Mode)

245.07 Cr

Pre Bid & Detailed design

Ceigall – IMC (JV)

Chief Engineer (NH) Punjab

19

Rehabilitation and Up-gradation to 2-Lane Paved Shoulder from Makhu (Design Ch. 0+000) to Arifke ( Design Ch. 24+600)  on EPC Mode in the State of Punjab, EPC Mode.

127.26 Cr

Pre Bid & Detailed design

Ceigall India Ltd.

Chief Engineer (NH) Punjab

20

Rehabilitation And Up-Gradation Of Nh.247 Section From Nilajphata-Paoni-Adayal-Bhandara From Existing Km 0+000 (NilajPhata To Km 53+400(Bhandara) [Design Km 0+000 To Km 53+260] To Two Lane With Paved Shoulders In The State Of Maharashtra On Epc Basis.

1,053.3 cr

Detailed Design

Atcon

NHAI

Projects On going

List of Projects

S.No

Name of Projects

Project Cost

Type of work

Client

Department

1

Construction/ Upgradation of Four/ Two lane with Paved Shoulder of NH 68 from Tanot-RamgarhBhadasar-Jaisalmer (Design Ch. 0.000 to 125.573) and NH from Bhadasar (Mokal)Sarkaritala up to Pakistan Border (Design Ch. 0.000 to 67.950) under Phase-I of BharatmalaPariyojana (total length 193.523km) on EPC Mode in the State of Rajasthan.

590.00Crore

Pre-Bid and Detail design

BrijGopal Construction Co. Pvt Ltd.(BGCC)

NHAI

2

Rehabilitation and augmentation of New NH-354 (old SH-21) of section Khemkaran town to Start of Amritsar bypass from Design Chainage km 22.673 (existing km 65.477 of SH) to Design Chainage km 71.496 (existing km 16.351 of SH) for Length of 48.823 km into Two Lane with the paved shoulder / Four-Laning under Bharatmala scheme in the state of Punjab on EPC Mode (Pkg-II)

149.90Crore

Detail Design work

Ceigall India Ltd.- Inderjit Mehta Constructions Pvt.Ltd.(JV)

NHAI

3

Four Laning of Existing Two Lane with Paved Shoulder Road from TalwandiBhai to Ferozepur NH-05 (Old NH-95) from km 170.380 to km 194.040 in the state of Punjab

207.00Crore

Detail Design work

Ceigall India Ltd.-Shiv BuildindiaPvt.Ltd.(JV)

NHAI

4

Rehabilitation and Up-gradation to 2-Lane Paved Shoulder of Mudki-Jawahar Singh Wala, Section of NH-254 from Design Km 19.500 to 38.000, in the State of Punjab, EPC Mode (Package No.1)

88.20Crore

Pre Bid & Detailed design

Ceigall India Ltd.

Chief Engineer (NH) Punjab

5

Rehabilitation and Upgradation of Moga (LoharaChowk on NH-05) at Design  Ch. 0+000 (Existing Km 0+000) to Makhu (at Junction with Nh 703A) at design Ch. 33+611 (Existing Km 33+622) (Design Length= 33.611Km including construction of ROB at LC 81-S/2-E at design ch. 32+240) via KotIse Khan and Harike (On NH-54 near Harike Town ) at Design Ch 44+680 (Existing Km 44+680) to Khalra (Up to International Border) at Design Ch 86+236 (Existing Km 86+203) (Design Length = 41.556Km including Construction of ROB at LC No.B53/E2 at Design Ch. 59+007) via Bhikhiwind to two lane with paved shoulders of NH-703B (Project Length =m 75.167Km.) in the State of Punjab.(EPC Mode)

245.07Crore

Pre Bid & Detailed design

Ceigall – IMC (JV)

Chief Engineer (NH) Punjab

6

Rehabilitation and Up-gradation to 2-Lane Paved Shoulder from Makhu (Design Ch. 0+000) to Arifke ( Design Ch. 24+600)  on EPC Mode in the State of Punjab, EPC Mode.

127.26Crore

Pre Bid & Detailed design

Ceigall India Ltd.

Chief Engineer (NH) Punjab

7

Rehabilitation And Up-Gradation Of Nh.247 Section From Nilajphata-Paoni-Adayal-Bhandara From Existing Km 0+000 (NilajPhata To Km 53+400(Bhandara) [Design Km 0+000 To Km 53+260] To Two Lane With Paved Shoulders In The State Of Maharashtra On Epc Basis.

Rs 1,053.3 crore

Detailed Design

Atcon

NHAI

We provide the best service in industry

Add a line that tells users how easily they can get in touch with you